All
Manufacturing/Repair
Jet Engine Air Seal
Repairing for Korean Air Force
Features
It was required to restore damaged part of turbine engine.
It originally took min. 3 months to replace worn out parts.
- Materials: Ti-6AI-4V
It was required to restore damaged part of turbine engine.
It originally took min. 3 months to replace worn out parts.
- Materials: Ti-6AI-4V
Products
MX-Fab
- Next 2026-08-04
- Previous 2026-08-04